Following points needs to be adapted in applying Thermoplastic Road Marking Paint on Bituminous Surface

  • Plotting of points on the carriageway for centreline and edge line markings as directed by the Engineer / Consultants.
  • Scrubbing of road surface with wire brush to remove dust from road surface.
  • Blowing of the removed dust from the surface with air – compressor.
  • Pre-marking of centreline / edge line / Kerb line using string and chalk method.
  • Simultaneously while the above activities are being carried out, thermoplastic material is heated in oil jacketed pre-heater fitted with hydraulic stirring arrangement. The thermoplastic material in the pre-heater is heated up to 180°C. The temperature is checked using an electronic temperature meter.
  • The machine to be used on the project: Hand-Push Machine or Fully Automatic Machine
  • The centre lines, pedestrian crossing etc. would be marked by hand-push machine or Fully Automatic Machine in view of the traffic flow on 10 Mtr. Road.
  • The molten thermoplastic material is transferred from the pre-heater to the thermoplastic road marking machine.
  • Temperature of the material is maintained in the applicator machine.
  • The material is screeded out from the machine through the heated shoe at a thickness of 2.5 mm. Drop on glass beads at a quantity of 300 gm/m² [including wastages due to wind pressure] are dispensed on the surface of this screeded thermoplastic marking. The dispensing of glass beads is irrespective of speed due to chain drive mechanism.
  • The carriageway with marking completed is opened for traffic after required drying time of application and proper setting of thermoplastic material.
  • The pedestrian marking would be done by hand-push manual machine. When the application cannot be done using the machines, approved manual methods shall be used e.g. for Arrows etc.

Following points needs to be adapted in applying Thermoplastic Road Marking on Concrete Surface

  • Plotting of points on the carriageway for centerline and edge line markings as directed by the Engineer / Consultants.
  • Marking of centerline / edge line using string and chalk method.
  • Manual brushing of road surface with wire brush to remove the dust from the surface.
  • Application of Primer on concrete road surface by Spray Machine or by Brush.
  • Start thermoplastic application only after 60 to 90 minutes after application of primer, so that Primer gets dry and set on the Concrete Surface.
  • Thermoplastic material is heated in a oil jacketed preheater fitted with hydraulic stirring arrangement. The thermoplastic material in the preheater is heated up to 180°C. The temperature is checked using a electronic temperature meter.
  • The molten thermoplastic material is transferred from the preheater to the applicator machine.
  • The material is screeded out from the machine through the heated shoe at a thickness of 2.5mm.
  • Drop on glass beads at a quantity of 300 gms/m² are sprinkled on the surface of this screeded thermoplastic marking.
  • The road marking is opened to traffic after two hours of application and proper setting.

Sep 12, 2018

Facebooktwittergoogle_plusredditpinterestlinkedinmail

Take The NEXT STEP
GET IN TOUCH
With A Solution Expert

Owing to our principled trade policies, we have attained a wide base of satisfied clients, and would like to hear and meet your requirements.

LATEST POST

Different Private and Government agencies consider us a reputed partner when it comes to procure road marking paint, and we are always on the limelight

The Importance of Quality Road Marking Paint

by admin

Road markings are primarily defined as markings embedded in, attached to, or applied to the road surface. In the past few years, with the increase ...

Prioritizing Road Safety with Road Marking Paint

by admin

It is never easy to drive any vehicle down the dark road on a hazy night. However, the assurance that road is safe to drive during night c...

Methodology Adapted For Thermoplastic Road Marking

by admin

Following points needs to be adapted in applying Thermoplastic Road Marking Paint on Bituminous Surface

The rise of Quality and Durable Road Marking Paint

by admin

In the last couple of years, as the development of National Highways is on the rise the demand for quality and durable road marking paints...